Midland Hotel – French Restaurant Communal areas

The works consisted of a full renovation of the French restaurants communal areas, as part of the works to upgrade the restaurants facilities.

The installation consisted of a full turnkey package, from full mechanical and electrical design, through installation and final commissioning. The electrical works consisted of lighting and power and fire alarm, whilst the mechanical installation encompassed, break ins to the existing services, domestic water services, drainage and sanitary, and ventilation systems.

The works were carried out within the occupied building with EE&MSL providing a high level of consideration for the workings of the building, which all remained in operation whilst the segregated works were carried out.

Manchester City Football Club – Training Academy

Scope of Works

The works consisted of carrying out modifications associated with the ventilation systems within the academy side of the training facility.

The scope was for EE&MSL to carryout investigative surveys along with Balfour Beatty Kilpatrick, and then install solutions on the ductwork to assist with the distribution of the air.

The works were carried out within the occupied building with EE&MSL providing a high level of consideration for the daily process of the building. This included ensuring that the works were segregated from general operations, whilst ensuring that the operation of the systems remained intact.

Ferrari Workshop

Project: Ferrari Workshop

Client: Stratstone Ferrari

Main Contractors: Jones Contractors Manchester Limited

Consultant/Designer: Elmec Mechanical And Electrical Services

Scope of Works:

The workshop service centre installation consisted of a new high level tubular radiant heating system to the service area, including extension of all high level gas pipework, commissioning of the heating system and a full service of some existing heaters. The electrical installation consisted of new high bay LED lighting, fire alarms and small power installations. These works included the coordination and connections to client supplied equipment.

All works were completed in line with Ferrari’s corporate identity and specifications. These works were completed to a tight programme of works to ensure that there was limited disruption to the operation of the service centre.

 

 

 

KWS Biotest Bristol

Project: KWS Biotest – Bristol

Client: KWS

Main Contractors: Claremont Limited.

Consultant / Designer: Elmec Electrical and Mechanical Services Limited

Scope of Works:

The project consisted of the building services design, installation and commissioning of electrical and mechanical services for a new laboratory and clean room facility.

The new mechanical installation included works to the, domestic hot and cold water, natural gas installation, above ground drainage installation, which includes provision for acids and toxic waste product, ventilation, air conditioning and insulation to services. Upon completion all works are fully tested, commissioned and set to work.

The electrical services carried out included works to, main switchgear, uninterrupted power supplies, sub distribution, general lighting, emergency lighting, fire alarms, small power, data, structured cabling, disabled alarms and refuge. Once again these installations were fully tested, commissioned and set to work.

Accrington Academy

Project: Accrington Academy Pavillion

Client: Lancashire County Council.

Main Contractors: Marshall Building Contractors Limited.

Consultant / Designer: Elmec Electrical and Mechanical Services Limited

Scope of Works:

The project was to carry out the services design, installation and commissioning of the electrical and mechanical services to the academy sports centre pavilion.

The new installation included works to the ventilation, air conditioning and insulation to services. Upon completion all works are fully tested, commissioned and set to work.

The electrical services carried out were works including, main switchgear, sub distribution, general lighting, emergency lighting, fire alarms, small power, data, structured cabling, lightning protection. Once again these installations were fully tested, commissioned and set to work.

Park Inn, York

Project: Park Inn York.

Client: Rezidor Group.

Main Contractors: Modern Project Services (NW) Limited.

Consultant / Designer: (PS)K Design Limited

Scope of Works:

The project consist of the upgrade of the domestic hot water services, boosted cold water and low pressure hot water services, and electrical supplies.

These works were upgraded whilst the entire hotel (200+ bedrooms, with associated communal areas, kitchens etc) remained live and fully functional. This consisted of installing pipework to new domestic hot water generators, cold water booster set and new LPHW boilers. The new systems were connected into the existing building throughout various areas including numerous live break ins on sizes up to 133mm copper, over a four week period. These connections were all carried out in a controlled manner through close liaison with hotel management, to ensure that works were completed within strict time frames to ensure no guests or staff were inconvenienced in any way.

Following completion of all the new works the systems were brought on line in a methodical and controlled manner throughout the hotel, in phases. This facilitated the smooth transition from the old system on to the new installation.

Wythenshawe Hospital

 

Project: Wythenshawe Hospital – CF Unit fit out

Client: Wythenshawe Hospital NHS Trust.

Main Contractors: Red Tree Building Contractors Limited

Consultant / Designer: The Associates Consulting Engineers Limited

Scope of Works:

We completed building services works within the hospital. The works were carried out whilst adjacent areas remained occupied. Due to the nature of the works and the building remaining occupied all works were carried out after hours (between 19:00 and 06:00 Monday to Friday) plus Saturday’s and Sunday’s.

All works were carried out to HTM requirements as would be expected of an installation with a fully functioning hospital.

Hattersley Group NHS Practice

Scope of Works

The project consisted of the services design, installation and commissioning of electrical and mechanical services to provide the practice with new LTHW heating and domestic hot water services.

Lancashire County Council Accrington Academy

Scope of Works

The project was to carry out the services design, installation and commissioning of the electrical and mechanical services to the academy sports centre pavilion.

The new installation included works to the ventilation, air conditioning and insulation to services. Upon completion all works are fully tested, commissioned and set to work.

The electrical services carried out were works including, main switchgear, sub distribution, general lighting, emergency lighting, fire alarms, small power, data, structured cabling, lightning protection. Once again these installations were fully tested, commissioned and set to work.

Orbit Developments – Deanway One

Scope of Works

The project consists of the services design, installation and commissioning of electrical and mechanical services to an existing office building refurbishment. This included the strip out of existing services and provision of a new installation.

The new installation included works to the low pressure hot water heating system, domestic hot and cold water, together with remote domestic water heater installations to break out areas, above ground drainage, sanitaryware installation, ventilation, air conditioning and insulation to services. Upon completion all works are fully tested, commissioned and set to work.

The electrical services carried out included, main switchgear, sub distribution, general lighting, emergency lighting, fire alarms, small power, disabled alarms and refuge. Once again these installations were fully tested, commissioned and set to work.