Scope of Works

The works consisted of carrying out modifications associated with the ventilation systems within the academy side of the training facility.

The scope was for EE&MSL to carryout investigative surveys along with Balfour Beatty Kilpatrick, and then install solutions on the ductwork to assist with the distribution of the air.

The works were carried out within the occupied building with EE&MSL providing a high level of consideration for the daily process of the building. This included ensuring that the works were segregated from general operations, whilst ensuring that the operation of the systems remained intact.