Park Inn, York

Project: Park Inn York.

Client: Rezidor Group.

Main Contractors: Modern Project Services (NW) Limited.

Consultant / Designer: (PS)K Design Limited

Scope of Works:

The project consist of the upgrade of the domestic hot water services, boosted cold water and low pressure hot water services, and electrical supplies.

These works were upgraded whilst the entire hotel (200+ bedrooms, with associated communal areas, kitchens etc) remained live and fully functional. This consisted of installing pipework to new domestic hot water generators, cold water booster set and new LPHW boilers. The new systems were connected into the existing building throughout various areas including numerous live break ins on sizes up to 133mm copper, over a four week period. These connections were all carried out in a controlled manner through close liaison with hotel management, to ensure that works were completed within strict time frames to ensure no guests or staff were inconvenienced in any way.

Following completion of all the new works the systems were brought on line in a methodical and controlled manner throughout the hotel, in phases. This facilitated the smooth transition from the old system on to the new installation.