Travelodge, Sale

Project: Travelodge, Sale

Client: Emerson Group

Main Contractors: Bailey Construction Limited

Consultant / Designer: Elmec Maintenance Limited

Scope of Works: 

Post completion of the Travelodge Sale scheme Elmec Maintenance has been appointed to carry out the full planned maintenance to the site.

This consists of full building wide checks on all mechanical, electrical and air conditioning installations.

The mechanical systems checks involves 3 monthly checks on the duct work and ventilation systems, checks to ensure the integrity of the main building water tank, safety checks to the gas fired water heaters, checks to the mains cold water booster sets, checks to all heating pumps, water quality and temperature checks including Legionella testing.

The electrical system checks consists of site visits by a qualified inspection engineer to visually check the condition and grade of the electrical systems, fire alarm testing and reporting, disabled refuge testing, emergency lighting run down tests, periodic inspection and testing, full inspection of the LV main distribution panel.

The air conditioning system checks consist of a full service and routine maintenance to the site wide heating and cooling system, this involves cleaning of all filters, checking external condenser oil levels, checking air and off evaporation temperatures, control checks, set point temperature checks, refrigerant level monitoring and checks to ensure the overall condition of the installation is maintained.